« Previous Post | Home | temperpedic »

oh noooos

By jelly | February 10, 2008

Well we got the go ahead to partially move in yesterday.  We are allowed to move the beds in however they cannot be against the wall, because the electrical needs to be fixed and re-inspected.  We thought this was good progress, so we moved in the two girls beds, and then waited for our new one to be delivered.  in the meantime we tried out the big new tub in the master bathroom.  Filled the tub all seemed good, then the wife said she could hear water running, I went down to the room below the tub, and didn’t see any water so I thought maybe just a leak into the drain.  About 5 minutes later I went into the basement and saw a downpour, water was running down everything, down the outside of the pipes, in the HVAC and I think just coming down the inside of the walls.  Luckily nothing on the main level but something definitely wrong with the plumbing of the tub.  I’m told they are going to come back on monday and fix it.

Topics: General |

Comments

Moldy Jello is powered by WordPress using the Micfo Web 2.0 Green theme created by Cory Miller